Client: Auckland Council
Location: Albany, Auckland
The project work involved refurbishment of a waste water treatment pond / SH 1 embankment.
It involved excavation within the pond and reshaping of the embankment. The embankment was excavated to a safe batter, and erosion protection works involving placement of armour rock was carried out.