Auckland Airport

Client: Brian Perry Civil Ltd
Location: Auckland Airport IRS and Stand 74

Prestigious winter work for the company for an Area of 56000 square meters. The project was started on 25th of June 2016 and ended before the programme date of 15 November 2016.

The location is on Air side which are called as the International Remote Stand, Stand 19 and Stand 74. The purpose of this project was to accommodate the A380 planes in one location, and to meet the parking facility for the increasing International air traffic Volume with all the new Airlines that is supposed to start for Christmas. The Outcome was very impressive as we were nominated as the most preferred contractors for the Airport company as well as the Brain Perry Civil Ltd.

Project Scope:

Stripping of Top soil, Erosion and Sediment Control, Excavation to sub-grade, Preparation of subgrade, Laying of Bidim 29, and backfilling with sub base course and base course of 300mm thick and hand over for concrete after the final Level checks.