Red Beach Stage 3 and 4 Earthworks and Diversions

Project Progress
100%

Client: PLDL
Location: Red Beach, Auckland

Contract to carry out 330,000m3 of cut to fill, upgrade one large pond, to install new sewer and storm water lines, replacing existing lines that ran through the site, and construct trunk storm water lines. Also part of the contract is to construct 390m of twin 450 PE sewer rising main and construct and signalise 1 intersection on the Hibiscus Coast Highway to take the new road into the subdivision. Work is running to program and 220,000m3 of cut to fill was carried out from Jan 2017- April 2017.  This work is being carried out on the remaining 30 hectares of the Peninsula Golf Course.

Project Scope; Ross Reid performed the role of main contractor to the principal, under a full contract as per NZS 3910:2013.